
Zone F — the connection
Everything between the inverter output and the grid.
The HV side of the site: substation, transformers, cables and the paperwork the network operator wants before it energises. We carry out the work and handle the DNO liaison that goes with it.
We provide the following connection services:
- Containerised substations to 33kV
- HV and LV cable jointing and terminations
- Testing and commissioning to 132kV
- HV and LV fault finding
- Protection settings and power system studies
- Transformer and switchgear installation
- Fibre, comms and controls
- DNO liaison and connection support

Client experience
Client quote here — what the site manager or asset owner said about the work.
Client name, company
Client quote here — one that speaks to reporting, reliability or safety.
Client name, company
Client quote here — one from a longer-standing contract.
Client name, company
Grid Connection
Energisation paperwork included
Protection settings, commissioning records and the DNO submission are part of the job, not a separate consultancy line. The site energises on the strength of documents we produced ourselves.
We aim to raise the standard of solar farm care in the UK — one contract, one supervisor, one report. Get in touch to find out more.
Contact us